shadow
Templates Community / WBS for Construction of House

WBS for Construction of House

EdrawMax user profile image
Kiraaaa
Published on 2021-07-01
Edit online
Generate Diagram with AI
Download
logoanimation
A Deliverable-Based Work Breakdown Structure clearly demonstrates the relationship between the project deliverables (i.e., products, services or results) and the scope (i.e., work to be executed). This diagram is an example of a Deliverable-Based Work Breakdown Structure for building a house. In this, construction of a house is breakdown into internal, foundation and external. Internal work is sub branched into electrical and plumbing. Same way foundation work is sub branched into excavate and steel erection. And lastly external work is sub branched into masonry work and building finishes. Here in each level percentage work done and budget has been mentioned. Please visit EdrawMax for plenty of similar templates to learn more about them.
Tag
Work Breakdown Struc
Report
4
7.4k
EdrawMax user profile image
Post
Recommended Templates