The schematic drawing of the water treatment plant for the 100 MW gas turbine power plant at BPDB in Habiganj consists of several key components. The water treatment plant is designed to treat and supply water to the gas turbine for cooling and other essential purposes. At the beginning of the process, the raw water is extracted from a nearby source and pumped through a series of screens and filters to remove large particles and debris. The water then enters a clarifier, where the remaining sediment and impurities settle to the bottom and are removed. Next, the water is subjected to a series of chemical treatments, including coagulation, flocculation, and disinfection, to remove any remaining contaminants and bacteria. The treated water is then sent to a storage tank for distribution to the gas turbine and other areas of the power plant. You can download this template from EdrawMax and customize it as required. EdrawMax has other similar templates that are 100 percent customizable.