This template represents a Work Breakdown Structure (WBS) for a cafeteria renovation project. The top level is "Cafeteria renovation," which is decomposed into three main branches: "Internal," "Foundation," and "External." The "Internal" branch further breaks down into "Electric" (with tasks like Lamp Installation, Motor Hood Fan, Smoke detector), "Plumbing" (including Sink Installation), and "Furniture" (such as Table & Chair, Kitchen Furniture). The "Foundation" branch focuses on the "Main Building" with components like Wall and Ceiling. The "External" branch covers "Mosaic," "Plaster," "Painting," and "Cleaning." This WBS helps in organizing and planning the renovation project systematically.